2026 PMP Street and Utility Improvements
Project Overview
On March 10, 2025, the Arden Hills City Council authorized preparation of a feasibility study for a potential 2026 PMP Street and Utility Improvements project affecting the following areas:
o Karth Lake Drive
o Pleasant Drive (between south and north cul-de-sacs)
o Pleasant Dr. (Amble Dr. to south cul-de-sac)
o Pleasant Circle
o Amble Drive (Karth Lake Dr to Lexington Avenue)
o Karth Lake Circle
o Cummings Park Drive
The City has contracted engineering consultant, Bolton & Menk, to conduct a feasibility study which will evaluate the extent and costs for replacement or repairs to street and trail pavement, water main, sanitary sewers and drainage infrastructure. They will be conducting field measurements and gathering survey information over the next several weeks. During this time, residents may notice a survey crew taking measurements in the roadway areas and to a limited extent in their driveway and front yard adjacent to the road. These measurements will be used in the study and assist with the engineering design. Underground utility items that are difficult to locate, such as the water service shutoff valve at the property line, will also be temporarily marked with flags or paint. These markings are temporary and can be removed once the survey crews have completed their work. During this evaluation process, residents adjacent to the proposed streets for the project will receive a survey form to assist with determining needed improvements within the neighborhood.
Construction is anticipated to begin Spring/Summer of 2026 with substantial completion within the same year. The City is planning to host a preconstruction open house at City Hall for residents within the construction area to join and ask specific questions to staff related to the project. Once the date and time of the open house is determined, notices will be mailed directly to the properties within the project.
Residents can also contact City engineering staff by email or phone with any questions or comments related to potential street and utility improvements.
Project Timeline
After completing the feasibility study anticipated to be in late June 2025, staff will provide additional information about the recommended improvements. This project page will also be updated as information becomes available.
Project Feasibility Report
The City Council will review the project Feasibility Report on July 14, 2025. The report outlines the recommended project components, costs and funding sources. View the Project Feasibility Report (PDF).
Final Plans and Specs
Upcoming Meetings & Events:
No upcoming events.
| Project Contacts | Phone | |
|---|---|---|
| Brad Fischer, Bolton & Menk | 612-759-7240 | bradfi@bolton-menk.com |
| David Swearingen, City of Arden Hills | 651 792 7847 | dswearingen@cityofardenhills.org |